This paper provides an in depth case study on the functional and performance testing requirements and the commissioning of a 10 MGD surface water “green field” water treatment facility. This includes coordinating the water treatment system project with the construction of a new dam/reservoir and a pipeline, all of which were integrated to deliver water to the County’s distribution system.