Determine Residual Determine Lifecycle & Continuous Effective Life Replacement Costs Improvement System Overview Sarasota County Public Utilities (SCPU) maintains and operates approximately: 97,500 water connections  85,000 sewer connections  4,000 reuse connections  Supplies drinking water to ~268,000 customers in the Unincorporated  County. Asset Definition and Atributes Summary Asset Group Asset Types Considered an Asset Thresholds Buildings/Grounds Building Structure, Grounds (fencing, gates, pavement, etc.), and One Grounds asset per site; Only electrical hoisting Hoisting Equipment equipment is an asset. Electrical Generator, Master Control Panel, MCC, Motor, Panel board, Master control panels and MCCs to be Switchboard, Switchgear, Transfer Switch (Automatic), Transformer, considered one asset including all internal EDR Power Supply, Valve Actuator, VFD components; Motors under HP or part of sealed unit are considered part of pump. HVAC AC Unit, Industrial Exhaust Fan Only Industrial size fans are assets. Instrumentation Field Instrument, Flow Meter, Control/PLC Panel, Control/RTU Sensor and transmitter considered one asset; panels to be Panel considered one asset including all internal components; local manual panels are not assets Piping/Valves Air Release Valve, Butterfly Valve, Check Valve, Gate Valve, Piping Valves 8” and up are assets; All actuated Exposed, Piping Buried, Slide Gate valves are assets; One piping asset per process Process Equipment Degasifier, Blower, Dual Media Pressure Filter, Cartridge Filter, Skid asset includes structure, piping, valves; EDR stacks Mixer, EDR Skids, EDR Stacks per skid. Process Structures Chemical Tanks, Fuel Tanks, Ground Storage Tanks, Sumps Day tanks are part of chemical system; (Containment Areas), Process Tanks underbelly tanks are part of generator asset. Pumps Centrifugal, Chemical Feed, Chemical Transfer, Submersible, Sump pumps are not assets. Collected Attributes PHYSICA FINANC LOCATI ASSET L IAL ON MANAGEMENT Asset ID Install Date Location Physical Asset Name Replace Cost Location Condition Asset Type Rehab Date Description Performance Manufacturer Estimated Condition Model Consequence of Useful Life Serial # Remaining Failure Capacity (see Redundancy Useful Life Risk table ) Future Water Demand Needs for Carlton Carlton WTF Phase II/III rehabilitation project will expand the EDR treatment capacity to MGD. Future Phase IV project will incorporate improvements to the pre- and post-EDR treatment processes to provide a total treatment capacity of MGD, which is the build out anticipated for this facility. A water supply permit modification is required to pump water from the existing wells and produce more than MGD. Water needs beyond MGD will be provided by the Peace River Manasota Regional Water Authority.

Details
First NameAleksandr
Last NameSpektor
KeywordsDrinking Water, Sensor, Cip, Assessment, Physical, Tanks
Year2024
FileTUE10-02_Spektor_Alex.pdf