Membrane bioreactor and reverse osmosis commissioning challenges are documented from startup of the Morro Bay Water Reclamation Facility. The presentation outlines the MBR-RO treatment process configuration, facility startup procedures, and specific operational challenges encountered during system integration for water reuse applications, with emphasis on solutions implemented to achieve stable and reliable operation.