Pilot Testing with Hollow Fiber Nanofiltration Membranes for Removal of NOM from Surface Water
This paper describes the 10 months pilot trial on a full-size Hollow fiber Nanofiltration membrane (HFNF) module of type HFW1000. During this pilot continuous high removal rates of Natural Organic […]
Evaluation of Scinor Membrane for Retrofit and Future Expansion at the SPMWD
This paper describes pilot testing at the San Patricio Municipal Water District (SPMWD) to quality a Scinor membrane module for use for a retrofit and expansion at the plant. The […]
Verdigris River WTP – Lessons Learned in First Year of Operation
This paper focuses on the lessons learned from the first 18 months of plant operation including performance of the pretreatment facility, membrane system fouling, and algae monitoring at the Verdigris […]
The Sherman Water Treatment Plant MF/UF and RO Pilot Study: Piloting During the 100 Year Flood
This paper summarizes the MF/UF and RO pilot study conducted on behalf of the City of Sherman for the upcoming expansion to their water treatment plant. The pilot took place […]
Water Treatment Plant Solves Membrane Integrity Problems and Satisfies New State Requirements
This paper details the City of Butler, MO existing low pressure membrane system and its integrity issues. To resolve some concerns, they tested a new membrane in one train and […]
Failure Testing as a Startup Tool for Membrane Filtration Plants
This presentation summarizes startup testing methodology used on six membrane filtration municipal water plant startups and will be soon used on startup of the second municipal ceramic membrane plant installation […]
Incorporating Membranes into Your Treatment Process: Startup and Lessons Learned
This paper will present the challenges and solutions to implementing low pressure membranes at the Dallas County Park Cities Municipal Utility District (DCPCMUD), plant that treats surface water from Lake […]
Accommodating Offsets in the RO Plant
This paper will review the risks of handling misalignment with a single coupling, and discuss the proper method for designing piping systems to accommodate an offset with two flexible grooved […]
Pilot to Full Scale Comparison of Wheeling, WV WTP
This PowerPoint presentation outlines the pilot testing at the Wheeling, WV location. A microfiltration system was installed and the performance test on startup is discussed with results presented.